ANALISIS RISIKO KECELAKAAN KERJA PADA PEKERJAAN PEMASANGAN BEKISTING DI PROYEK KONSTRUKSI (Studi pada Proyek Pembangunan Kampus X di Yogyakarta)

APRILIA, RIZQI, A2A215061 (2017) ANALISIS RISIKO KECELAKAAN KERJA PADA PEKERJAAN PEMASANGAN BEKISTING DI PROYEK KONSTRUKSI (Studi pada Proyek Pembangunan Kampus X di Yogyakarta). Sarjana / Sarjana Terapan (S1/D4) thesis, ["eprint_fieldopt_institution_Universitas Muhammadiyah Semarang" not defined].

[img]
Preview
Text
ABSTRAK.pdf

Download (244kB) | Preview
[img]
Preview
Text
BAB I.pdf

Download (509kB) | Preview
[img]
Preview
Text
BAB II.pdf

Download (1MB) | Preview
[img] Text
BAB III.pdf
Restricted to Repository staff only

Download (411kB) | Request a copy
[img] Text
BAB IV.pdf
Restricted to Repository staff only

Download (680kB) | Request a copy
[img]
Preview
Text
BAB V.pdf

Download (384kB) | Preview
[img]
Preview
Text
DAFTAR PUSTAKA.pdf

Download (500kB) | Preview

Abstract

Latar belakang: Pekerjaan konstruksi yang memiliki bahaya tinggi salah satunya adalah pemasangan bekisting. Pekerjaan yang dilakukan di ketinggian menduduki peringkat pertama sebagai penyebab kecelakaan kerja di Indonesia. Risiko kecelakaan kerja d ketinggian antara lain terjatuh, terpeleset, tersaandung dan kejatuhan material dari atas. Risiko tersebut tidak dapat dihindari dari setiap pekerjaan, namun dapat diminimalisir dengan adanya proses manajemen risiko. Manajemen risiko meliputi kegiatan identifikasi bahaya, analisis risiko dan evaluasi risiko. Tujuan: Penelitian ini bertujuan untuk mengetahui risiko kecelakaan kerja pada pekerjaan pemasangan bekisting di proyek konstruksi. Metode: Penelitian ini merupakan jenis penelitian observasional dan dianalisis secara deskriptif. Objek penelitian ini adalah pekerjaan pemasangan bekisting di proyek konstruksi. Responden penelitian ini berjumlah 8 orang, antara lain 1 orang mandor pekerjaan pemasangan bekisting, 2 orang operator tower crane, 2 orang rigger, 2 orang staff K3 dan 1 orang staff teknik. Hasil: Potensi bahaya yang teridentifikasi dari pekerjaan pemasangan bekisting ini adalah 16 potensi bahaya dari 4 tahapan pekerjaan. Pada penilaian risiko didapatkan 3 bahaya kategori risiko tinggi (high), dan 1 bahaya risiko sedang (medium), dan 3 potensi bahaya yang paling berisiko adalah terjatuh dari ketinggian, sling tower crane putus dan segel baja tidak terpasang dengan benar.Simpulan: Seluruh tingkat risiko mengalami penurunan yaitu 1 tingkat risiko menjadi rendah (low) pada tahap fabrikasi bekisting, 3 tingkat risiko menurun menjadi sedang (medium) pada tahap lifting bekisting, install climbing bekisting dan penempatan bekisting. Kata Kunci: Manajemen risiko, bekisting, konstruksi, ketinggian Background: Construction has a variety of high hazards, one of which is working at height. Working at height is the first rank as the cause of work accidents in Indonesia. Risk of working at height is falling down, slips, trips, and falling objects. The risk can not be avoided from every job, but can be minimized by the existence of risk management process. Risk management includes hazard identification, risk analysis and risk evaluation. Objective: This study aims to determine the risk of occupational accidents in installation formwork on construction projects. Methods: This is a descriptive observational study. The object of this research is installation of formwork on construction project. The respondents of this research are 8 peoples, which is 1 foreman of installation formwork, 2 tower crane operators, 2 riggers, 2 HSE staffs, and 1 technical staff. Results: The potential hazards identified from the installation formwork are 16 potential hazards from 4 stages of work. In the risk assessment, there are 3 danger of high risk category, and 1 medium risk category, and the 3 most potent risks are falling from a height, the sling tower crane is broken and the steel seal is not installed properly. Conclusion: All risk level decreased, that is 1 level of risk to low on formwork fabrication, 3 level of risk decreased to medium on formwork lifting, install climbing formwork and formwork placement. Keywords: risk management, formwork, construction, working at height

Item Type: Thesis (Sarjana / Sarjana Terapan (S1/D4) )
Call Number: 090/S1FKM/I/2018
Subjects: R Medicine > RA Public aspects of medicine > RA0421 Public health. Hygiene. Preventive Medicine
Divisions: Faculty of Public Health > S1 Public Health
Depositing User: perpus unimus
URI: http://repository.unimus.ac.id/id/eprint/1090

Actions (login required)

View Item View Item